
Migrol
New manhole chambers installed and the pipework adapted to the new layout.
Read the report →Beneath every fuel station lies a network no one sees – yet it has to carry everything. For over 30 years we've used PE plastic pipes in Swiss station construction, making us pioneers. Today we lay PE, steel and stainless steel: single-walled, double-walled, pressure-monitored.

From 1997 we built Switzerland's first fuel stations with plastic pipework and brought the first PE piping system to approval here. For over 30 years we've been laying flexible PE systems from various manufacturers for underground installation – suction or pressure, whichever suits the project.
And because no two installations are the same, we also master steel and stainless steel. At AGROLA Sirnach in 2025, for instance, we used PE pipes from NUPI.

| Size | Design | |
|---|---|---|
| PE (plastic) | 32–160 mm | single- and double-walled |
| Steel, welded | up to 4" | welded |
| Steel, threaded | up to 4" | threaded |
| Stainless steel | – | welded or press-fitted |
| PE product line | 32–110 mm | flexible PE system for underground use |
| PE leak detection / outer pipe | 40–160 mm | for double-walled systems |
| Inner pipe | Outer pipe | |
|---|---|---|
| 32/40 | 32 mm | 40 mm |
| 50/63 | 50 mm | 63 mm |
| 63/75 | 63 mm | 75 mm |
| 90/110 | 90 mm | 110 mm |
| 110/125 | 110 mm | 125 mm |


New manhole chambers installed and the pipework adapted to the new layout.
Read the report →Planning, site management and tank installation – with NUPI PE pipework for HVO, diesel, AdBlue, unleaded 98 and 95.
Complete pipework for the new motorway service area, plus planning support and tank monitoring.
Co-developed and installed pipe systems for fuel storage and supply at the new station.
Remote fill and suction lines plus new vent lines in PE, manhole chambers refurbished with PetroSump.
Transfer station for road tankers with stainless steel and PE lines – three pumps up to 1000 l/min.
Product lines, double-walled remote fill and AdBlue lines and vents in PE, new PetroSump PE manhole chambers.
Around 180 m of double-walled line to three consumers – with approx. 11 m of height difference.
PE pipework, single- and double-walled, AdBlue on both sides of the island.
We've laid more pipe than the drive from Zurich to Bern.
PE from 32 to 160 mm, single- and double-walled, welded or threaded steel up to 4", and welded or pressed stainless steel.
New build, conversion or line replacement: get in touch – we plan and lay.
Send an enquiry